(4) all existing or new utilities shown at their actual burial depths.
3-5. EXPANSION COMPENSATION. All expansion systems, loops,
and bends, will be sized in order to prevent excessive pipe stresses (due mainly from thermal expansion) from exceeding those allowed by the Power[r]