In this paper, a novel scheduler, termed QoS-Aware scheduling, is designed and proposed for Massive MIMO to use the channel aging to increase the sum-rate but guarantee the minimum bit rate per user to support QoS.
We consider a multicell multiple-input multiple-output (MIMO) coordinated downlink transmission, also known as network MIMO, under per-antenna power constraints. We investigate a simple multiuser zero-forcing (ZF) linear precoding technique known as block diagonalization (BD) for
of the channel estimator has a critical e ff ect on the perfor- mance of the receiver [13, 14]. In SISO communications, channel estimators can either use the training sequence or not. Although the distribution of training symbols in a block of data a ff ects the performance of systems[r]
The Idealized Wireless Fair Queuing (IWFQ) simulates an error-free channel by applying a compensation model on top of the WFQ scheduler [25]. A start tag and a finish tag are associated to each packet, as for WFQ. The flows are serviced according to increasing service tags of the flows pe[r]
Voice activity 0.67 1 1 1 Table 2. WCDMA service parameters employed in the simulation. 2.6 Space-Time Diversity Techniques The spatial properties of wireless communication channels are extremely important in de- termining the performance of the systems. Thus, there has been great interest in[r]
As an effective solution to the tradeoff between array size and the number of antenna elements, dual polarization antenna is widely utilized in massive MIMO systems. However, existing channel state information (CSI) feedback schemes are not suitable for dual-polarized massive MIMO as they ignore the[r]
the dual problems of maximizing expected throughput given limited energy and of minimizing expected energy given the minimum throughput constraint. The above works have significantly enhanced the overall performance of wireless communications. However, they did not consider the scheduling p[r]
simulate two special scheduling policies. Round-robin [ 43 ] is a nonopportunistic scheduling policy that schedules users over all subcarriers in a predetermined order. It is simple but lacks flexibility. The round-robin policy can serve as a perfor- mance benchmark to measure how much[r]
When the administrative assistant has a paper copy of the timesheet, he or she enters the data into the time and billing add-on software for Ferguson and Bardell, Inc.’s accounting package. Each week, the administrative assistant prints a summary of each project team’s time for the[r]
13.3 USE OF HIERARCHY Floorplanning and prototyping may be flat or hierarchical. In a flat floorplan, the entire design is treated as a single problem, and any cell or block can be placed at any location in the design. There is no need to assign cells and pins to the blocks, or create block budget[r]
This paper presents a method of calendar (weekly) scheduling for production teams, when the average orders utility function is used as the quality criterion. The method is based on the concept of “production intensity”, which is a dynamic parameter of production process. Applied software package all[r]
Flashback Drop allows you to “undrop” database objects. No longer will you have users desperate for the entire database to be restored to a point in the past because they thought they were on the DEV instance instead of PROD. There’s nothing all that dramatic about how Flashback Drop has[r]
communicate the Channel Strategy and Plan. In this case, please use your discretion to add any additional section(s) as needed. Instructional and Descriptive Text: Some sections in this document include bracketed text. This text is instructional in nature and is included to describe what[r]
4.2.4 Channel Productivity [Channel Selling Unit Productivity * Number of Units * Rate per Unit For example: Telemarketing: 100 telemarketers * 10 units per day * $10 per unit = $10,000/day Sales force: 100 sales reps * 1,000 units per week * $10 per unit = $1,000,000/week R[r]
The software CVX that we will be using only accepts convex optimization problems defined as above; i.e, CVX accepts the following constraints: • Convex ≤0.. NOTES Further reading for thi[r]
We consider the resource-constrained project scheduling problem with respect to the makespan minimization criterion. The problem accounts for technological constraints of activities precedence together with resource constraints. Activities preemptions are not allowed. The problem with renewable reso[r]
“Hard” linguistic constraints, such as these, tend to affect mostly the “core grammatical func- tions”, i. e. the argument functions (rather than e. g. adjuncts) of a particular predicate. As these functions constitute the core meaning of a sen- tence (as in: who did what to whom), it is impo[r]
1. Introduction The Soil Constraints and Management Package (SCAMP) has been developed to identify soil constraints to crop production by considering a range of key soil properties (Moody and Phan Thi Cong 2008; Moody et al. 2008). Once these constraints have been identi[r]
Table 1 Qualitative description of the relationships among some stress factors encountered in the use of lead–acid batteries for renewable energy applications and aging processes Aging p[r]